VANCOUVER, British Columbia, March 06, 2018 -- Chimata Gold Corp. (TSX.V:CAT) (“Chimata” or the “Company”) is pleased to announce that it is in the process of completing a NI 43-101 Technical Report (the “Provisional Report”) with Zimbabwe Lithium Company (Mauritius) Limited (“ZIM”), the completion of such satisfactory technical report being a condition precedent to the entering into a Definitive Agreement with ZIM, as provided in the Company’s previous press release dated February 14, 2018. ZIM, includes in its definition its wholly owned subsidiary, Jimbata (Private) Limited, a company operational in Zimbabwe as the local transacting company for the Kamativi Tailings Dump Project (the “Project”).
The Provisional Report reveals an exploration target with a volume range of 14,800,000 to 15,080,000 cubic meters and a tonnage range of between 23,000,000 to 25,000,000 metric tonnes of tailings material, the Kamativi Tailings Dump (“KTD”) at a grade range of 0.29 % to 1.13 % Li2O with 70% being Spodumene. The potential tonnage and grade is conceptual in nature as there is insufficient exploration data to define a Mineral Resource, as this term is defined in NI 43-101 Respecting Standards of Disclosure for Mineral Projects (“NI 43-101”). The Company cautions that further exploration may not result in the delineation of a Mineral Resource estimate.
The Provisional Report reveals that a total of 28 grab samples have been extracted from the KTD, at a grade of between 0.29% to 1.13% Li2O. Early stage Mineralogy and Heavy Liquid Separation has been completed on the grab samples by ZIM, through SGS Randfontein South Africa, and indicates that 70% of the lithium mineralisation, of the sample tested, is spodumene. As the Kamativi Tin Mine was historically operational, significant infrastructure for the site is still in place. This includes power, water and a road network, all near to the mine and/or on site. Chimata sees this Project as a Brownfield project with a clear and quick path to production.
To view the full text of this news release in its entirety, please follow the link below:
http://chimatagoldcorp.com/wp-content/uploads/2018/03/2018.03.06-Updated-43-101-Press-Release-for-issuance-2.pdf
ON BEHALF OF THE BOARD
Richard Groome
Chairman and Interim President and CEO
Further information regarding the Company can be found on SEDAR at www.SEDAR.com
Contact:
Steve Cozine
604-674-3145
[email protected]


Baidu Approves $5 Billion Share Buyback and Plans First-Ever Dividend in 2026
Prudential Financial Reports Higher Q4 Profit on Strong Underwriting and Investment Gains
Rio Tinto Shares Hit Record High After Ending Glencore Merger Talks
Once Upon a Farm Raises Nearly $198 Million in IPO, Valued at Over $724 Million
Hims & Hers Halts Compounded Semaglutide Pill After FDA Warning
Weight-Loss Drug Ads Take Over the Super Bowl as Pharma Embraces Direct-to-Consumer Marketing
TrumpRx Website Launches to Offer Discounted Prescription Drugs for Cash-Paying Americans
Amazon Stock Rebounds After Earnings as $200B Capex Plan Sparks AI Spending Debate
Alphabet’s Massive AI Spending Surge Signals Confidence in Google’s Growth Engine
American Airlines CEO to Meet Pilots Union Amid Storm Response and Financial Concerns
Missouri Judge Dismisses Lawsuit Challenging Starbucks’ Diversity and Inclusion Policies
Trump Backs Nexstar–Tegna Merger Amid Shifting U.S. Media Landscape
Washington Post Publisher Will Lewis Steps Down After Layoffs
Sony Q3 Profit Jumps on Gaming and Image Sensors, Full-Year Outlook Raised
SoftBank Shares Slide After Arm Earnings Miss Fuels Tech Stock Sell-Off
DBS Expects Slight Dip in 2026 Net Profit After Q4 Earnings Miss on Lower Interest Margins 



