VANCOUVER, British Columbia, Sept. 11, 2017 -- MX Gold Corp. (TSX-V:MXL) (FSE:ODV) (OTCQX:MXLGF) (the “Company” or “MX Gold”) At the request of IIROC the Company wishes to clarify disclosure in its September 8, 2017 news release issued earlier today entitled “MX Gold Corp Receives 1,000 Tonne Per Day Throughput Estimates on the Magistral Project” (the “Prior Release”). The disclosure of estimated tonnage, estimated gold/tonne, estimated silver / tonne, recovery rate gold; recovery rate silver, commercial production, free cash flow, life of project and total free cash flow was a violation of NI 43-101 – Standards of Disclosure of Mineral Projects as no preliminary economic assessment, preliminary feasibility study or feasibility study has been filed to support any of the disclosure. The disclosure constitutes Restricted Disclosure per NI 43-101, 2.3. Also, NI 43-101, 4.2 requires the filing of a technical report to support disclosure of this nature – no technical report has been filed to support the disclosure. As a result the disclosure is not compliant with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Company hereby retracts the entirety of the Prior Release and readers should not rely on the disclosure contained in the Prior Release, including the following statements and table disclosing the technical results and project economics:
- “While all project objectives and estimates have been done on a non-43-101 complaint basis, for project planning purposes and based on the increased production capacity, the company is using the following updated targeted yields:
| Magistral Project | ||||
| Estimated Tonnage | 1,200,000 Metric Tonnes | |||
| Gold Price | $1,275 | |||
| Estimated Gold / Tonne | 2.06 grams | |||
| Estimated Silver / Tonne | 3.9 grams | |||
| Recovery Rate Gold | 76% | |||
| Recovery Rate Silver | 45% | |||
| Commercial Production (CP) | 30,000 Tonnes per month | |||
| Free Cash Flow – Pretax / Quarter (CP) | $3,014,500 USD | |||
| Life of Project (assumes no additional ore feed) | 3.5 years | |||
| Total Free Cash Flow Generated (Pre-tax) | $42,203,000 | |||
- “* The CM report does not comply with National Instrument 43-101, Standards of Disclosure For Mineral Projects, a qualified person has not done sufficient work to classify the historical estimate as a current mineral resource or reserve and the Company is not treating the historical estimate as a current mineral resource or reserve.”
- “**Based on work done in January 2012 by Corporación Ambiental de México, S.A de C.V. A historical estimate was completed by Corporation Ambiental de Mexico SA de CV on Jan. 20, 2012, titled “Perforacion y Muestreo en Presa de Jaleas Estimation Volumetrica, Tonelaje y Ley Promedio.” The CM report estimated a probable reserve of 1.25 million tonnes averaging 2.06 grams per tonne gold. The assumptions for this estimate were based on 58 auger samples, 2.45 metres to three metres in length from 24 drill holes.”
- “*****Lorne Warner, P.Geo., is a director of the Company and a qualified person as defined by National Instrument 43-101. Mr. Warner has not verified any of the data disclosed in this news release.”
The company also wishes to clarify that no qualified person prepared, supervised the preparation or approved the scientific and technical disclosure in the above news release as required by NI 43-101, 2.1 and 3.1.
On behalf of the Board of Directors,
“Akash Patel”
Akash Patel, Vice President and Director, MX Gold Corp.
For further information, please contact
Dan Omeniuk, CEO
Email: [email protected]
Or by email to:
Neither the TSX Venture Exchange Inc. nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange Inc.) accepts responsibility for the adequacy or accuracy of this press release.


Amazon Stock Rebounds After Earnings as $200B Capex Plan Sparks AI Spending Debate
Nvidia Nears $20 Billion OpenAI Investment as AI Funding Race Intensifies
Toyota’s Surprise CEO Change Signals Strategic Shift Amid Global Auto Turmoil
Nintendo Shares Slide After Earnings Miss Raises Switch 2 Margin Concerns
TSMC Eyes 3nm Chip Production in Japan with $17 Billion Kumamoto Investment
Once Upon a Farm Raises Nearly $198 Million in IPO, Valued at Over $724 Million
Anthropic Eyes $350 Billion Valuation as AI Funding and Share Sale Accelerate
Ford and Geely Explore Strategic Manufacturing Partnership in Europe
CK Hutchison Launches Arbitration After Panama Court Revokes Canal Port Licences
Sony Q3 Profit Jumps on Gaming and Image Sensors, Full-Year Outlook Raised
TrumpRx Website Launches to Offer Discounted Prescription Drugs for Cash-Paying Americans
AMD Shares Slide Despite Earnings Beat as Cautious Revenue Outlook Weighs on Stock
Nvidia, ByteDance, and the U.S.-China AI Chip Standoff Over H200 Exports
SpaceX Prioritizes Moon Mission Before Mars as Starship Development Accelerates
Alphabet’s Massive AI Spending Surge Signals Confidence in Google’s Growth Engine
SoftBank Shares Slide After Arm Earnings Miss Fuels Tech Stock Sell-Off
OpenAI Expands Enterprise AI Strategy With Major Hiring Push Ahead of New Business Offering 



