COLUMBUS, Ohio, Dec. 07, 2015 (GLOBE NEWSWIRE) -- Emerson Network Power, a business of Emerson and the world’s leading provider of critical infrastructure for information and communications technology systems, today announced new research results showing that half of all data center cooling systems will be upgraded before the end of 2016.
The survey of IT, facilities and data center managers in the United States and Canada, conducted by Emerson Network Power, reveals that while 40 percent of data centers have been upgraded in the past five years, nearly 20 percent are in process and about 31 percent will be upgraded in the next 12 months.
Primary drivers behind these upgrades include need for higher equipment reliability, greater energy efficiency and additional capacity. The move toward using efficient and sustainable technologies is apparent in upgrade activities. About 39 percent of respondents said upgrades had to meet state energy codes. About 32 percent cited ENERGY STAR® and 23 percent cited LEED as requirements for upgrades.
The survey found that 62 percent of the upgrades are in data centers under 10,000 square feet and that 18 percent are in data centers larger than 50,000 square feet. “Reliable performance and efficiency have always been critical to large data center performance. As the edge and cloud computing become ubiquitous, ensuring the health of cooling systems at smaller, localized data centers and computer rooms is crucial. Thermal upgrades are allowing companies to improve protection, efficiency and visibility within all these spaces,” said John Peter Valiulis, vice president of thermal management marketing for Emerson Network Power in North America.
Other findings from the Emerson Network Power survey include:
- 35 percent received energy rebates or planned to, and 75 percent of those who did were able to receive them within six months.
- 43 percent are adding variable speed drives that allow cooling unit fans to be operated according to changes in airflow requirements, instead of running at constant speeds.
- 41 percent are adding or replacing thermal controls to optimize the performance of variable speed technologies.
- 40 percent are adding economizers to provide “free cooling” when outside temperatures allow.
- Getting budget approval was cited as the most difficult challenge in upgrade projects, while configuring thermal controls was the easiest.
For more information about how to improve reliability, protection and visibility with thermal upgrades visit EmersonNetworkPower.com/Cool-Upgrades
About Emerson Network Power
Emerson Network Power, a business of Emerson is the world’s leading provider of critical infrastructure technologies and life cycle services for information and communications technology systems. With an expansive portfolio of intelligent, rapidly deployable hardware and software solutions for power, thermal and infrastructure management, Emerson Network Power enables efficient, highly-available networks. Learn more at www.EmersonNetworkPower.com.
About Emerson
Emerson, based in St. Louis, Missouri (USA), is a global leader in bringing technology and engineering together to provide innovative solutions for customers in industrial, commercial, and consumer markets around the world. The company is comprised of five business segments: Process Management, Industrial Automation, Network Power, Climate Technologies, and Commercial & Residential Solutions. Sales in fiscal 2015 were $22.3 billion. For more information, visit Emerson.com.
Contact: Steve Friedberg 610.518.7474 [email protected]


Boeing Secures New Labor Contract With Former Spirit AeroSystems Employees
NRW Holdings Shares Surge After Securing Major Rio Tinto Contract and New Project Wins
SpaceX Updates Starlink Privacy Policy to Allow AI Training as xAI Merger Talks and IPO Loom
Tesla Launches New Model Y Variant in the US Starting at $41,990
Oracle Plans $45–$50 Billion Funding Push in 2026 to Expand Cloud and AI Infrastructure
AMD Shares Slide Despite Earnings Beat as Cautious Revenue Outlook Weighs on Stock
Using the Economic Calendar to Reduce Surprise Driven Losses in Forex
Elon Musk’s SpaceX Acquires xAI in Historic Deal Uniting Space and Artificial Intelligence
Palantir Stock Jumps After Strong Q4 Earnings Beat and Upbeat 2026 Revenue Forecast
Denso Cuts Profit Forecast Amid U.S. Tariffs and Rising Costs
Jensen Huang Urges Taiwan Suppliers to Boost AI Chip Production Amid Surging Demand
Boeing Signals Progress on Delayed 777X Program With Planned April First Flight
Nintendo Shares Slide After Earnings Miss Raises Switch 2 Margin Concerns
Nvidia Confirms Major OpenAI Investment Amid AI Funding Race
Panama Supreme Court Voids Hong Kong Firm’s Panama Canal Port Contracts Over Constitutional Violations
Australian Scandium Project Backed by Richard Friedland Poised to Support U.S. Critical Minerals Stockpile
CK Hutchison Unit Launches Arbitration Against Panama Over Port Concessions Ruling 



